Jump to content

M12 (Istanbul Metro)

From Wikipedia, the free encyclopedia
M12 60. Yıl Parkı-Kazım Karabekir
Construction of the line at Tütüncü Mehmet Efendi station in 2023
Overview
StatusUnder construction
OwnerIstanbul Metropolitan Municipality
LocaleIstanbul, Turkey
Termini
  • 60. Yıl Parkı
  • Kazım Karabekir
Stations11
Websitehttps://uagmetro.ist/
Service
TypeRapid transit
SystemIstanbul Metro
Services1
OperatorMetro İstanbul A.Ş.
History
Planned opening19 December 2026 (2 months' time) (2026-12-19)
Technical
Line length13.03 km (8.10 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification1,500 V DC Overhead line

Line M12, officially referred to as the M12 60. Yıl Parkı-Kazım Karabekir line, is a rapid transit line of the Istanbul Metro system, currently under construction in the Asian part of Istanbul, Turkey.

Built by the Istanbul Metropolitan Municipality, the line will be 13.03 km (8.10 mi) long with 11 stations. The travel time between the end stations will be 21 minutes.[1] It is expected that it will carry around 44,000 riders per hour per direction.[1] The line will run through three districts of Istanbul, namely Kadıköy, Ataşehir and Ümraniye. It will connect to other rapid transit lines at Tütüncü Mehmet Efendi station to the Marmaray commuter rail, at Yenisahra to line M4 Kadıköy–Sabiha Gökçen Airport, and at Çarşı to line M5 Üsküdar–Sultanbeyli.[2]

The investment budget of the construction is ₺ 2.376 billion.[3] The construction of the line began with work at the southern terminus, 60. Yıl Parkı, in August 2017,[2] however work was stopped on 2 January 2018.[4][5][6]

The new mayor, Ekrem İmamoğlu, announced that the metropolitan municipality restarted the construction works.[when?] The first test runs on the line were launched on 14 March 2024, between Göztepe and Kazım Karabekir,[7] but construction on the line stopped again later in 2024.[6] Work restarted in October 2025, with the line's operation now expected to begin on 19 December 2026.[6][8]

As of April 2026, construction on the line is 97% complete.[9]

Stations

[edit]
No Station District Connections Type Notes
1 60. Yıl Parkı Kadıköy İETT Bus: 4, 16, 16D, ER1, ER2, FB1, FB2, GZ1, GZ2 Underground Göztepe Park・Caddebostan・Bağdat Avenue
2 Tütüncü Mehmet Efendi Marmaray (Göztepe)
İETT Bus: 4, 16, 16D, ER1, ER2, FB1, FB2, GZ1, GZ2
Tütüncü Mehmet Efendi Street
3 Sahrayıcedit İETT Bus: 2, 8E, 9K, 10B, 10E, 10G, 14AK, 14B, 14CE, 14ES, 14Y, 14ÇK, 14ŞB, 15SK, 15YK, 15ÇK, 17, 17L, 19ES, 19F, 19K, 19M, 19S, 19Y, 20D, 20K, ER1, ER2, FB1, FB2, GZ1, GZ2 Sahrayıcedit Mosque・Fahrettin Kerim Gökay Street
4 Yenisahra Ataşehir Line M4
İETT Bus: 8A, 8Y
Habire Yahşi Anatolian High School
5 Ataşehir İETT Bus: 8A, 8K, 8Y, 10A, 13, 13AB, 16M, 19FS, 256, KM46 Ülker Sports and Event Hall・Palladium Shopping Mall
6 Finans Merkezi Ümraniye M13 (Istanbul Metro) (Finanskent, planned)・HızRay (planned)
İETT Bus: 8K, 8Y, 11M, 13B, 13H, 13M, 13Y, 14BK, 19FS, 20D
Istanbul Financial Center
7 Site İETT Bus: 8K, 8Y, 11M, 13B, 13H, 13M, 19FS, 20D SOYAK Yenişehir Apartments
8 Atakent İETT Bus: 9A, 10G, 11M, 13AB, 14B, 20Ü İstiklal Martyr Lokman Oktay Secondary School・Istiklal Park
9 Çarşı Line M5
İETT Bus: 9A, 9Ç, 9Ş, 9Ü, 9ÜD, 10, 11D, 11G, 11K, 11P, 11V, 13, 13B, 13H, 13TD, 14, 14B, 14DK, 14E, 14ES, 14K, 14YE, 19D, 20, 131, 131A, 131B, 131C, 131T, 131TD, 131YS, 131Ü, 138, 139, 139A, 320, 522
Ümraniye Bazaar・Alemdağ Street
10 SBÜ Hastanesi İETT Bus: 7, 9, 9K, 9T, 10, 10G, 11, 11A, 11ÇB, 11K, 11P, 11ST, 11ÜS, 13H, 14D, 14E, 14K, 14YK, 15B, 15BK, 15TK, 15TY, 20, 20K, MR9 Ümraniye Municipality & District Governorate・Istanbul 29 May University Ümraniye Campus・Ümraniye Training & Research Hospital
11 Kâzım Karabekir M14 (Istanbul Metro) (planned)
İETT Bus: 7, 11K, 11ST, 14E, 14K, 15B, 15YK 20K
Adem Yavuz Street・Seyrantepe Street

References

[edit]
  1. 1 2 "M12 Göztepe-Ümraniye Metro Hattı". metro.istanbul (in Turkish). Retrieved 2026-03-07.
  2. 1 2 "Ümraniye- Ataşehir- Göztepe metro hattı çalışmaları başladı". NTV Turkey (in Turkish). 2017-08-12. Retrieved 2017-08-13.
  3. ↑ "Metro hattının detayları kesinleşti!". Yeni Akit (in Turkish). Retrieved 2017-08-13.
  4. ↑ "İBB, bütün metro ihalelerini iptal etti". CNN Türk (in Turkish). 2018-01-02. Retrieved 2026-09-28.
  5. ↑ "6 metro projesinde ihale iptali". Milliyet (in Turkish). 3 January 2018. Retrieved 2018-01-03.
  6. 1 2 3 Preston, Robert (2 March 2026). "EBRD provides more funding for Istanbul metro project". International Railway Journal. Retrieved 7 March 2026.
  7. ↑ "Local elections prompt flurry of Istanbul metro openings". Railway Gazette International. 11 April 2024. Retrieved 2026-01-12. On March 14, testing began on the first section of the 13 km Line M12 between Göztepe and Kazım Karabekir, which is expected to open next year.
  8. ↑ "ÜMRANİYE-ATAŞEHİR-GÖZTEPE METRO HATTI 2026 SONUNDA AÇILIYOR!". Istanbul Metropolitan Municipality (in Turkish). 27 September 2026. Retrieved 28 September 2026.
  9. ↑ İstanbul Büyükşehir Belediyesi (5 April 2026). "Ümraniye - Ataşehir - Göztepe Hattı'nda ilerleme, %97 seviyesine ulaştı". X (formerly Twitter) (in Turkish). Retrieved 16 April 2026.