Period between() method in Java with Examples

Last Updated : 27 Nov, 2018
The between() method of Period class in Java is used to obtain a period consisting of the number of years, months, and days between two given dates (including start date and excluding end date). This period is obtained as follows:
  • Remove complete months.
  • Now, calculate the remaining number of days.
  • Then, adjust to ensure that both have the same sign.
  • Now, split the number of months into years and months based on a 12 month year.
  • Consider a month, if the end day-of-month is greater than or equal to the start day-of-month (Eg.: from 2017-05-12 to 2018-07-18 is one year, two months and six days).
Note: Period obtained from above formula can be a negative, if the end is before the start. The negative sign will be the same in each of year, month and day. Syntax:
public static Period between(LocalDate startDateInclusive,
                             LocalDate endDateExclusive)
Parameters:
  • startDateInclusive - The start date is inclusive and must not be null.
  • endDateExclusive - The end date is exclusive and must not be null.
Return Value: The between() function of period returns the period between the given start and end date. Below is the implementation of above function: Java
// Java code to show the period
// between given start and end date
import java.time.LocalDate;
import java.time.Period;

public class PeriodClass {

    // Function to calculate period between
    // start and end date
    static void calculatePeriod(LocalDate startDate,
                                LocalDate endDate)
    {
        Period period = Period.between(startDate, endDate);
        System.out.println("Period between start and end "
                           + "date is : " + period);
    }

    // Driver Code
    public static void main(String[] args)
    {
        // Start date
        LocalDate startDate = LocalDate.parse("2017-02-13");

        // End date
        LocalDate endDate = LocalDate.parse("2018-08-20");

        calculatePeriod(startDate, endDate);
    }
}
Output:
Period between start and end date is : P1Y6M7D
Reference: https://docs.oracle.com/javase/8/docs/api/java/time/Period.html#between-java.time.LocalDate-java.time.LocalDate-
Comment