【The Project Manager's Way / Creative Awards 2026 Entry】PM's Logbook: Take the Helm of Your Own Future

Prologue

A flawless plan with no room for criticism. However, it is the way of the world that things do not always proceed as scheduled. Reality hides uncertain shadows.
From the outside, the project site may look smooth and glamorous. Yet, behind the scenes, it is always filled with an overwhelming, gritty reality where leaders put their bodies on the line to hold back impossible challenges.

While the air is still fresh, we dare to hold a torch to the darkness and count the pebbles at our feet. I have gathered here the records of our clumsy yet beloved voyage, which begins in just such a way.




1. Do not fear "risk," manage it

Before a project sets in motion, there is a time to stare at the Gantt chart.
There, you see a beautifully aligned bar graph of tasks. It might look like a perfect plan. However, a gritty sense of anxiety remains somewhere in your heart.
“Will it really proceed like this?”

Reality is neither that linear nor that orderly. Someone might catch a cold, and a client's change of heart can arrive like a sudden evening shower. New tools and technologies may bare their fangs the moment you start using them. We call these uncertainties risks, and we tend to push them away like some kind of ominous spell.

However, what is truly frightening is not the risk itself. It is walking blindly into the dark without knowing what you are facing. The best managers hold a torch to that darkness while the air is still fresh. They start by counting the pebbles at their feet, one by one.


The true nature of the "shadows" lurking in a project

Risks that derail a project have several faces.

First, there is the most unpredictable element: humans.
One day, an ace member suddenly brings in a resignation letter, saying, “I’ve found what I really want to do.” This is not just a numbers problem of being short-staffed. It comes with a shock that feels like the soul has been ripped out of the team.
Skill mismatch is the same. The story that someone’s foundation was actually shaky in an area they were supposed to know well sounds like a joke, but on the front lines, it is a tragedy.

Next, the labyrinth called scope.
What was supposed to be just a “small addition” at first grows into a giant monster that shakes the very foundation of the project. As a result of proceeding without a clear definition of how far to go, a single comment near completion— “This isn’t what I imagined”—causes the bricks you’ve stacked up to come crashing down with a roar.

And then, the trap of tools.
It turns out that a new system you introduced with good intentions is fatally incompatible with the existing foundation. A distortion, like trying to force a luxury car engine into a compact car, is discovered at the very last minute.

These are by no means special; they are the true nature of the shadows that lurk daily at any project site.


Before starting, dare to write down the "worst-case scenario"

To get past these shadows, there is something experienced professionals do. Before the project begins, while no one has been hurt yet, they dare to concretely imagine the worst possible outcome.

For example, the risk of someone leaving. In this case, you build in a kind of dry mechanism beforehand so that things keep running even if a specific person is gone. You prevent work from becoming a black box and ensure information is thoroughly shared. While this may seem like a cold-hearted decision, it is actually a kindness to reduce the burden on the remaining members and protect them.

To prevent the expansion of requirements, it is effective to create a list of “things we will not do” at an early stage. We will do this much, but we will not step beyond this point. Drawing a clear line might sometimes feel cold. However, to keep the ship from sinking, you must have the resolve to limit the cargo you bring on board.

If you are anxious about a new approach, one strategy is to create a small testing ground and intentionally let it fail first. If you trip early on, the damage remains minimal. Tripping over a small step before falling off a large cliff—this is a wise way to set up a preventive measure to avoid getting severely burned.


The flexible strength born from preparation

Risk management is by no means about becoming a worrier and living in fear. Rather, it is closer to the feeling of shaking hands with potential future troubles in advance.

"If a storm comes, we will take shelter in this cove."

"If we run out of food, we will stop at that island."

A captain who has decided these things in their heart will not fall into a panic when the waves eventually rise. They can calmly steer the ship and give instructions to the team with composure. Seeing that unwavering back, the members can calm their own agitation and look forward once again.

There is no need to aim for zero trouble. The goal is to have the strength to say, "It's okay, this is within expectations," no matter what happens.
That flexible strength is born from just a little bit of imagination before the project begins.



2. Characteristics of a project manager trusted by the team

A storm of specification changes, unreasonable deadlines raining down from upper management, and the backs of team members quietly wearing down.
If you are on the front lines of business, you have likely seen this scene of being surrounded on all sides at least once. Managers caught in the middle are always lonely, and everyone carries the pain of being squeezed from both sides.

In such a harsh environment, there are leaders who are somehow welcomed by the team with a smile, saying,
"If that person says so, I guess we have no choice but to do it,"
and who end up strictly meeting both budget and deadlines.
What is the difference between them and those who end up as mere coordinators?

The job of leading a project might be a form of "language translation."
It is the role of converting the abstract ideals and numbers spoken by management into concrete tasks that the team can execute. However, in many workplaces, this translation gear does not mesh well, and the team burns out from the friction.

What we should truly be aiming for is not a perfect progress chart, but a thick pipe of trust running between people.


Discarding the indulgence of being a "nice person"

We might be slightly misunderstanding the meaning of being trusted by the team.

A leader who is just kind is, in reality, often the most problematic presence for the team. They take the unreasonable demands of upper management and bring them down to the team, saying,
"Sorry, these are instructions from above, so please find a way to make it work,"
bowing their head and begging. This is not kindness; it is merely an abandonment of thought.

What members are looking for is not a companion to complain with at a bar. They are looking for a professional who will put themselves on the line to maintain an environment where they can immerse themselves in their work without hesitation.

Trust is different from emotional closeness.
"If I work with this person, they will protect us from impossible demands."
"The work will ultimately move forward properly."
It is a kind of peace of mind.

It is much like a breakwater protecting a harbor from rough seas. To do that, you absolutely need the toughness to sometimes fight against upper management or clients. The resolve to stop being a 'nice person' is what builds the foundation of true trust.


Don't take it back; show your stance on the spot

When observing the actions of trusted leaders, you notice a certain common moment.
When a client or boss says,
'Can you also do this as an addition?'
they never say,
'I will take this back and consider it.'
They show their stance right there on the spot.

Of course, this doesn't mean they just reject everything by saying 'I can't' on the spot. If you do that, you just become a stubborn person and get removed from the negotiation table.

They immediately present the trade-off conditions without hesitation, saying,
'If we do that, we need to either cut this existing feature or extend the schedule by two weeks. Which would you prefer?'
What to gain and what to discard. They weigh it on the scales right there.

When you are under a leader whose decision-making axis does not waver, the work environment becomes truly easier. This is because the unreasonable balls thrown from above are transformed into neatly organized tasks by passing through the filter of the leader.
Do not leave the ball in the team's court. Take it yourself and clear it up on the spot. That sense of speed speaks more eloquently of trust than any words.


The negotiation power to deliver a 'no' with a smile

How should we behave when faced with unreasonable demands? This is where you show your skills as a business professional.
Trusted leaders do not get emotional at the negotiation table. They communicate thoroughly using facts—that is, data.

Saying, 'It's impossible because the members are exhausted,' does not resonate with those who have decision-making authority.
Instead, they provide concrete alternatives, saying,
'With the current budget and personnel, the probability of trouble occurring will jump by 30% with the proposed deadline. There is a risk of a fatal failure at the time of service launch, but do you still want to proceed? If you want to guarantee quality, we should narrow it down to these features in the first phase.'

This is a negotiation that can only be done because they are prepared to take the heat for the sake of the team.
Team members are surprisingly sensitive to how much tough negotiation their leader has done behind the scenes to act as their shield.

You don't have to understand the fine technical details of the practical work. The team will never betray a leader who acts like an excellent salesperson, valuing what they have created at the highest level and selling it to the outside world.


Discarding spirit-based arguments and speaking of love through numbers

There is one more thing they never say. That is the spirit-based argument of,
'If we just try hard, we'll make it in time.'

The more a project falls into a pinch, the more logically and coldly they break down the tasks. Who is using how many hours for which task? Where is the bottleneck? They visualize all of these with numbers.

At first glance, it might look like a restrictive management method that monitors members. However, this is the greatest weapon to prevent overwork.
Because there are facts in the form of numbers, they can take concrete adjustment measures such as,
'This part is about to break, so let's call for support.'
'Let's push this specification to the next time.'
Hidden behind the cold data management is a strong human touch that ensures the team will never be crushed.

For the team, this is also a relief, as their situation is accurately understood. By having a common language of numbers, a healthy dialogue is born where they can say, 'What is impossible is impossible,' and 'We can do it up to this point.'


After hanging up the phone

The job of a manager is truly lonely. You are demanded to produce results from above, and you are bombarded with complaints from below. The more serious you are, the more likely you are to take everything on your own shoulders as your own responsibility.

However, if unreasonable demands come down from above again, try changing your communication style just a little. Try stopping, just once, from translating those instructions from above directly to your team.

Take that request in yourself first, and rack your brain on how to prevent the team from getting hurt, or how to present an alternative to the client.
And, in response to alerts raised by members, try saying:
"Alright, I'll take care of that adjustment, so everyone please focus on the work in front of you."

With those words, the atmosphere in the workplace will likely begin to change.

When you become the breakwater for your team, the team will surely become your strongest ally. After you hang up the phone, take a deep breath. A new relationship of trust begins from there.



3. The true meaning of "taking responsibility"

Friday at 5:00 PM, during the final testing phase of development. The moment you think you can finally see the goal, a fatal bug leaps onto the screen. Cold sweat runs down your back, and the team's atmosphere freezes in an instant.
For anyone working in IT, this is a moment that makes everyone hold their breath at least once.

"So, who is going to take responsibility?"

The cold voices of bosses or clients echo in the meeting room. When we hear these words, we inevitably think of negative penalties like apologies, demotions, or someone's resignation.
It is because the image of post-incident processing—where the person who did something wrong gets punished—is too deeply ingrained.

However, in the profession of a Project Manager (PM), that interpretation might be a bit off the mark.
If responsibility simply meant bowing your head and saying, "I am sorry," then in an extreme case, anyone could just bow their head and be done with it.
What is truly required should not be such cleaning up of the past.

For the engineers on the ground, this is not someone else's problem. We have shed too much sweat into that code to just dismiss it by saying, "The manager can just apologize." In the smoke of a project on fire, everyone is hurt as a stakeholder.

That is precisely why I want to rethink the essence of the word "responsibility," not as a cold system, but with a human touch.


Words that judge the past, words that create the future

"Responsibility," as used in daily conversation, is often used to judge "past results."
Like saying, "You made the wrong decision there, so make up for it here." But in an ongoing project, time never turns back.

For a PM, responsibility actually has two sides.

One is the responsibility of accountability. When a project stalls, you calmly analyze why it happened and explain it to stakeholders with transparency. It is the act of facing facts head-on instead of blaming someone else. This can be called the minimum foundation for maintaining organizational trust.

And the other is the responsibility of transformation. This is the essence.
It is to think about "how to rebuild future success from this broken situation" based on the fact of failure, and to take concrete action.

Apologizing is nothing more than 'stopping the bleeding.' True responsibility is a kind of alchemy: it involves the gritty, persistent execution of preventive measures afterward, transforming the lessons of failure into organizational assets.

When you think of it this way, taking responsibility starts to feel like a very active, and even somewhat creative, act.


The moment you apply leverage to the front lines

So, in what specific situations is that responsibility put to the test? Ultimately, it is when 'your decision-making deviates from the final outcome.'

For example, when expectations with a client diverge due to flaws in requirement definitions.
Or when a schedule you were optimistic about—thinking it would be fine—completely collapses due to bugs late in the development phase.
In these moments of crisis, it becomes starkly apparent how well a project manager has been preparing during normal times.

A PM who can truly take responsibility first ensures 'information transparency.'
The more unfavorable the information, the more important it is to disclose it quickly, even if it is unsightly. Just like early detection of an illness, not hiding the risk of delays is the greatest key to saving a project.

Even more important is exercising 'authority' correctly.
Leaders who want to escape responsibility strangely fear using their authority. They postpone decisions like reassigning members or boldly cutting specifications.
This is because making a decision creates new responsibilities. But authority is the 'leverage' used to get a project back on track. It is precisely because you are prepared to take responsibility that you can use that leverage to its full potential.

There is also a hint here for how you, as a technical professional, can support your leader.
If the PM above you is desperately trying to convey unfavorable information to upper management or is trying to cut scope through painful decisions, that is not evidence of them running from responsibility—it is proof that they are facing it head-on.
At that moment, if you can work together from the technical side to think about 'how to improve the process,' the team will demonstrate incredible resilience.


The kindness of not attributing failure to 'people'

As is often said in psychology and leadership research, under a leader who blames specific individuals for failures, the team will gradually start to lie.
Even when a bug is found, they begin to cover it up, thinking, 'It's okay not to say anything yet.'

Excellent PMs do not attribute failure to people. They thoroughly adopt the perspective that 'the result is my responsibility, but the cause lies in the process.' Instead of blaming the engineer who made the mistake, they operate on the system as a whole—the checking system that allowed the mistake to happen, the lack of tools, or the unreasonable schedule.

This is not mere coddling. It is the only way to foster a healthy organizational culture that is coldly rational while remaining empathetic to human beings.

For technical professionals, this could happen to you tomorrow. You never know when you might introduce a major bug. At that time, how much of a relief would it be to have a leader who blames the process and not you? At the same time, I hope you, too, can maintain the perspective of blaming the mechanism rather than the person when your colleagues make mistakes.


Wear that armor with pride

The word 'responsibility' feels heavy, like a burden weighing down on your back. But perhaps that is not actually the case.
Responsibility is not something you 'carry' on your back; it is something you 'wear' like armor to protect your body.

A PM stands on the front lines, using that armor to protect the team from unreasonable external criticism. Within the safe space created that way, members can finally perform at their best without feeling intimidated.

If the project you are involved in is currently facing difficulties, I want you to try reframing that responsibility not as something to fear, but as an 'opportunity to change the future.'

There is no such thing as a perfect plan. Systems without bugs do not exist. That is precisely why what matters is how we act after trouble occurs.
It is in those very footsteps that a project manager's 'way of life' is truly carved out.



4. The Trap of Micromanagement That PMs Fall Into

'How is the progress?'
'Are you sure that way will really work?'
'Hey, let me see your screen for a second.'

Don't you find yourself throwing these words around every day, whether between desks or via remote work chat tools?

Surely, you have no ill intent. In fact, these words likely stem from a strong sense of responsibility and passion—a desire to see the project succeed at all costs and a wish to spare your members from hardship.

The reality is that the more a project manager (PM) is considered excellent, the more they tend to use these phrases as a habit.

However, at a certain point, that enthusiasm ends up stripping away the members' autonomy. It can transform into a management addiction known as 'micromanagement'.

It is a state of excessively intervening in the details of work, continuously directing and supervising every single move. This is somewhat similar to a 'toxic parent' who, while loving, tries to control every action their child takes.

Even though the person thinks they are doing what is best, they are slowly, yet surely, eroding the healthy growth of the team.

Here, I will reflect on the light and shadow of this management style, and the kind of leadership we should aim for.


Why do even excellent PMs retreat into a 'silo'?

Micromanagement literally means 'micro-level management'.
It stems from a state of mind where one becomes obsessed with the fine details of the work on the ground and cannot rest unless everything is under their control.

At the root of this behavior lies, in fact, deep-seated 'anxiety' and 'perfectionism'. The fear that if they don't check things themselves, mistakes will happen or the schedule will be delayed, is what drives the PM.

This tendency appears strongly in environments like IT projects, where deadlines are strict and technical decisions are complex.

PMs often retreat into their own world like a 'silo'. They tend to try to grasp all information by themselves. It is like a chef who, no matter how skilled they are, refuses to let their subordinates hold a knife and gives detailed orders on how to cut every single vegetable.

At first, a beautiful dish might be prepared. However, as a result, the subordinates stop thinking and become mere 'limbs' that only carry out tasks exactly as told.
It is the moment when the potential of the entire team is confined within the capacity of a single PM.

Of course, there is a temporary 'light' to this approach as well.

Because the PM checks every detail based on their experience, in the short term, you will likely get deliverables with fewer mistakes. Through strong leadership, tasks may temporarily progress faster.
However, that is merely buying 'temporary peace of mind' at the cost of 'permanent exhaustion'. Eventually, the PM themselves becomes the bottleneck for all decision-making, and the productivity of the entire team will drop dramatically.

Members who only follow procedures lose their problem-solving abilities and become dependent, unable to move a single step without a PM.


The Turning Point from Distrust to Trust

When you look at actual project sites, this excessive management manifests in various forms.
Thinking of some concrete situations, I will consider how we should steer toward 'trust'.

(1) Over-interference in work methods
  It happened at a certain site. There was a PM who would force revisions on materials or code created by members, imposing extremely personal preferences that were not in the coding standards or common rules.
  They would specify everything down to the font size and the subtle nuances of variable names. The members who were corrected felt their motivation wearing thin, thinking, 'Am I just a typist? I feel like I'm working to suit the PM's mood rather than focusing on essential technology.'

  The desirable response here is to hold back from giving specific instructions on how to do things. Instead, try delegating the authority to create standards itself to the team by saying, 'It's not decided as a general rule, but why don't we create readability standards as a team?' It is important to form an agreement on the direction to aim for, rather than restricting the method.

(2) Abnormal reporting requirements
  At another site, due to the PM's growing anxiety, a rule was made to 'report progress via chat every three hours.' They would unconsciously keep an eye on who left their seat and at what time. For the members, it was a suffocating feeling, as if they were constantly being monitored with an embedded GPS. Work was interrupted repeatedly to create reports, breaking the concentration on development, which is the most important thing.

  In this case, it is necessary to reduce the frequency of reports and shift the focus from 'time' to 'results.' Tell them, 'It's fine if you just share the previous day's results and today's plan simply at the start of the next morning.' Ingenuity is required to turn the reporting venue into a checkpoint for confirming mutual trust, rather than surveillance.

(3) Monopoly of decision-making and expression of doubt
  In meetings with clients, there are PMs who interrupt the moment a member tries to make a technical proposal, saying, 'Let me take that back and confirm it myself.'
  Members feel as if they have been robbed of opportunities for growth, thinking, 'I am not even trusted to handle client interactions.' Furthermore, if they are constantly met with words of doubt like 'Are you really okay?' or 'Will you make it in time?' even after a task is completed, the smiles completely disappear from the team.

  The true role of a PM is not to stand over members and monitor them. It is to dedicate themselves to 'support' by removing the stones from their path so they can run comfortably. Whether you can say, 'You take the lead on this one. Just let me know about any problems or final decisions after you're done,' and the attitude of supporting from behind by asking, 'Is there anything I can help with?' will dramatically change the atmosphere of the site.


Three thoughts to graduate from micromanagement

 To advance from domination to liberation, there are three ways of thinking to keep in mind.

 The first is to leverage trust.
 A PM's time and energy are by no means infinite. If you hold everything yourself, your resources will inevitably run dry someday.
 Excellent PMs invest their energy in the form of 'trust' in their members. By using the time created by delegating the site, they concentrate on higher value-added work such as risk management, coordination with relevant parties, and presenting the team's vision.
 Trust can be said to be the asset with the best return on investment for the future of a project.

 The second is to intentionally design a 'safe space' that allows for failure.
 If you demand 100% perfection for every task, the team will shrink and stop taking on challenges. Declare out loud, 'This phase has strong experimental elements, so 70% completion is fine. Instead, let's try trial and error quickly.'
 It is because there is a safety zone where they can think it's okay to learn even if they fail that the team can create innovations to overcome difficulties.

 The third is to have a 'perspective as an observer' that takes a step back.
 An 'ant's eye view' that delves into the details of the site is sometimes necessary, but what a PM should really have is a 'bird's-eye view' that overlooks the entire project. Have a metacognitive perspective and calmly observe, 'Where is the bottleneck that this team is struggling with the most right now?'
 This pulled-back perspective is the compass that will save us from the temptation of micromanagement.


Conclusion

 On a ship called a project, the PM is the captain. If the captain is always looking at a small compass or how individual sailors tie their ropes, they will not be able to notice the storms approaching from beyond the horizon or the changes in the great currents.
 You need to trust the steering technique and leave it to the navigator, while you keep your eyes fixed on the ship's destination.

 Certainly, letting go of the reins is scary. It takes courage. However, when you let go of those reins, the members will stand on their own feet for the first time, and they will start running toward the goal with a speed and creativity we never imagined.

The essence of leadership lies not in control, but in the process of trusting and empowering your members.



5. The PM's Style: Turning 'Loneliness' into Strength

Friday, 10:00 PM. In the office, there is only you and the blue light of your display. A chat that just arrived from a client lists a series of ruthless demands for specification changes. Your team is exhausted from days of overtime, and you cannot possibly ask any more of them. Pressure from upper management to cut costs is only intensifying.

At times like these, have you ever felt a sharp, tightening sensation in your chest, thinking, 'I can't consult anyone about this decision'?
That is not because you are incompetent; it is the gateway to the profound loneliness that is the fate of the PM role.

Project Manager, or PM for short. The title has a somewhat glamorous ring to it. Perhaps it conjures images of a 'commander' or 'captain' leading a project to success.
However, behind that glamour, many PMs feel an emotion they keep hidden: 'loneliness'.

Is this a feeling of being surrounded by an invisible wall, as if no one could ever understand you? Why is it that PMs are so prone to feeling lonely?


Why do PMs find themselves 'besieged on all sides'? The true nature of 5 types of loneliness

A PM's loneliness arises from a complex entanglement of several factors. These range from emotional issues to those stemming from the role itself.
Here, we will look at the specific forms of that loneliness.

First is the 'loneliness of decision-making'.
This is the loneliness felt in situations where the PM must make the final decision on a project alone. It comes with the pressure of choosing the best path from many options and bearing the responsibility for the outcome by yourself.

For example, when it is discovered that a project's budget will be exceeded, the PM must decide whether to increase the budget or cut some features. The team wants additional budget, while management demands feature cuts. Caught in this squeeze, the PM is the only one who can make the final call.
This is what you feel when there is no one you can consult.

Next, there is 'positional loneliness'.
While a PM is a 'member' of the project team, they simultaneously hold the role of 'manager' of the project. This creates a sense of not belonging to either camp, born from this middle-management role.

For instance, the team grows frustrated with daily overtime, while upper management demands further efficiency. The PM must strictly manage progress for the sake of the project's success, even while understanding the members' struggles. Sometimes, members think, 'You don't understand our hardships,' while management views the PM as 'too lenient with management'.
This caught-in-the-middle situation breeds loneliness.

And then, 'psychological loneliness' arrives with the silence of the night.
This is the internal sense of loneliness arising from the stress, anxiety, and fear of project failure that a PM carries, which cannot be confided in team members or superiors. The belief that 'I must not show weakness' deepens this loneliness further.

For example, a PM knows that a project is delayed due to technical issues, but keeps that anxiety to themselves to avoid lowering team morale. This is because they fear that telling the team might cause them to panic.
Also, they might put on a brave face to their boss, saying, 'It's fine, I'll handle it,' and be unable to discuss their true worries.
The moment you sense the signs of what is known as a 'death march' in the IT field, and you are sweating cold sweat behind a poker face, is exactly this.

Furthermore, 'information loneliness' adds fuel to the fire.
A PM aggregates all information regarding a project. However, they cannot share everything. This is the loneliness born from carrying highly confidential information or negative information that could adversely affect team motivation all by oneself.

For example, a PM learns that the client's financial situation is deteriorating and that the project budget might be cut. If they share this information with the team, the members' motivation might drop. However, if they don't share it, they cannot prepare for future plan changes. The PM carries this dilemma alone, with no one to consult.

Finally, there is 'loneliness in performance evaluation'.
Even if a project succeeds, the achievement is evaluated as the effort of the entire team, so the PM's individual contribution can be hard to see. Conversely, if it fails, they often bear the responsibility alone.

For example, a project led by a PM succeeds safely and generates significant revenue. The company as a whole praises it as a 'wonderful achievement by the team,' but few know how much the PM struggled behind the scenes. On the other hand, if the project ends in failure, the cause is often attributed to the PM's lack of management, leading to a harsh evaluation.
This way of evaluating, where success is dispersed and failure is concentrated, invites a certain sense of sadness.

In addition to these, PMs are constantly faced with new technologies and environmental changes, making them prone to a vague sense of anxiety—a 'loneliness born from anxiety about the future'—that their own skills might become obsolete.
It is also painful that this career anxiety is difficult to share with colleagues or subordinates. With few colleagues in the company to consult, and the pressure that 'a PM should always be learning new knowledge,' they end up bottling up that anxiety alone without being able to speak their true feelings to anyone.


What we can do to face loneliness

How should we face this loneliness?
The path of a PM is by no means an easy one. That is precisely why the mindset and actions to overcome loneliness are so important.

First, consciously break down the walls.
PMs are often in a position one step removed from the team. However, if things stay that way, the invisible walls will never disappear. Try setting aside time once a week for casual conversation unrelated to work with members, or having lunch together.
For example, by holding a retrospective meeting with the entire team at each project milestone and sharing not only successes but also failures, you can enhance the team's sense of unity. From a little bit of small talk, the true feelings held by engineers on the front lines might just spill out.

And above all, what is most important is to have the 'courage to show vulnerability'.
There is no such thing as a perfect human being. The same goes for PMs. However, many PMs tend to think, 'I must not show my weaknesses.'

Let me share a small anecdote about a veteran PM.
When he faced a technical challenge at the core of a large-scale system—a literal storm of specification changes—he dared to admit his own limits. He honestly told them in a meeting, 'To be honest, the latest technology in this field is outside my expertise. That is why I absolutely need your professional skills.'

It was the moment he took off the mask of the perfect boss. And what happened? Instead of blaming him, the engineers on the team seemed somewhat happy, laughed and said, 'It can't be helped,' and spontaneously proposed solutions to each other, clearing the problem in no time.
Exposing your own weaknesses does not mean defeat. Rather, it is a shortcut to building relationships of trust with those around you, and it can be a powerful high-level tactic to strengthen team cohesion.

At the same time, do not forget to have time for yourself.
A PM's work is always established through interactions with others. That is precisely why it is important to consciously have time for yourself alone. Even if it is just 15 minutes a day, drink coffee quietly, listen to your favorite music, or read a book. Completely step away from the project and reset your mind.
This serves as self-care to free yourself from anxiety and pressure. You need time to come up to the surface from the deep loneliness, like the Mariana Trench, and take a breath.


True management power beyond loneliness

Truly growing as a PM is not just about honing the skills to make a project successful. It is also about responding to the invisible wall called loneliness and carving out your own path.

The success or failure of a project is not determined solely by the individual ability of the PM. What is important is the human power to move the entire team and evoke empathy. While carrying loneliness, you transform it into the team's energy. This can be called the true power required of a PM.

Instead of being afraid of loneliness, try reframing it as being in a special seat where you can look over the whole picture flatly from a slightly higher place because you are lonely. When your perspective changes, the scenery also looks a little different.


To all the solitary commanders

PMs may sometimes feel that 'no one understands me.' However, that is by no means something only you are feeling. Many PMs are struggling and agonizing in the same way, yet still trying to move forward.

Loneliness is a trial for a PM to grow. Do not carry it all alone; sometimes show your weakness and build relationships of trust with your team. By doing so, you will realize that before you know it, there are many allies around you.

To you, who are holding your head in your hands alone in front of the display again tonight.
That loneliness is proof that you are facing your duties, and your team, more sincerely than anyone else.



6. Managing Your Own Career

Why is it that we are so sensitive to the progress of others and the budgets of our teams, yet when it comes to our own future, we feel as if we are walking through a fog?
Even if you are good at drawing up project schedules, have you ever had the experience of your hands stopping on the keyboard the moment you try to map out your own five-year roadmap?

We struggle every day as captains guiding a 'ship'—our limited resources and time—toward a destination across a sea where waves of uncertainty constantly crash down. This is a truly tough job that requires not only technical knowledge, but also the human skills to move people and organizations, the courage to deal with unexpected situations, and above all, the resolve to take responsibility for the results.

However, this role of captain does not end when one project is finished. The next ship you board is usually larger than the last, and the route is often more complex. In the midst of those rough seas, who exactly is going to manage your ability as a captain—in other words, your career itself?

The answer is clear. It is none other than you yourself.

No matter how drastically the world of business and IT may change, I will unravel the theme of managing 'your own career,' which is essential for living a long and deep life.
I will delve into this topic.


Calibrating your inner foundation and sharpening your skills as a captain

The first step in career management begins with surprisingly mundane work. It is about 'knowing yourself'.
Just as you take stock of your members' skills and resources to ensure a project runs smoothly, you need to periodically and coldly look at your own strengths and weaknesses.
Are you better at requirements definition, or at putting out fires on failing projects? Rather than desperately trying to overcome your weaknesses, sharpening your distinct strengths is far more likely to increase your value in today's market.

At the same time, while setting your axis toward the goal you should aim for, it is essential to have the habit of recording your achievements and lessons learned like a 'logbook'.
It is not just the facts of 'what you did,' but the records of introspection—'why it went well, why it failed'—that become the source of know-how to increase the probability of success at your next site.

Also, do not forget health management, including stress management.
If the captain collapses, no matter how magnificent the ship, it will drift. Keeping your own mind and body healthy is the minimum responsibility of a professional and the foundation for not dulling your judgment.


Setting new sails and turning tacit knowledge into explicit knowledge

The world of IT is a sea of rapid change where the common sense of yesterday becomes the nonsense of today. Standing still means a slow retreat.

Knowledge systems for project management like PMP and Agile are worth learning as the 'lingua franca' of the industry. However, they are merely tools. An interest in understanding 'what can be done with that technology, even if I cannot write the code myself' regarding the latest technologies like data analysis, AI, and the cloud is what creates innovation in projects.

Furthermore, the perspective of viewing a project not just as a collection of technologies, but as a means of realizing business, becomes important.
Leaders who can discuss return on investment (ROI) and have a grasp of the basics of finance, contracts, and legal affairs are seen as having a management perspective and will inevitably be elevated to the next stage.

No matter how wonderful a textbook you read, you cannot learn how to steer through a storm. Experience is your most valuable asset. To ensure you don't end it as just 'lucky success,' you need to devise ways to turn your planning and monitoring processes into explicit knowledge and leave them as documents that anyone can reproduce.
This will become a powerful weapon that concretely substantiates your resume.


Obtaining an international passport and a lighthouse on the ocean

Once you have polished your skills, the next step is to prove them using a format common to the market.

Certifications serve as a business card that demonstrates your expertise.
By combining international certifications like PMP or Scrum Master with peripheral knowledge such as ITIL, your market value as a 'T-shaped professional'—possessing both breadth and depth rather than being a mere specialist—naturally increases.

It is ideal to update your organized professional resume with numerical data every time a project concludes.
Concrete figures, such as 'reduced delivery delays by 30%' or 'improved customer satisfaction by 15%,' serve as an excellent radar for measuring your value in the external labor market. Surprisingly, your market value is often higher outside your current company than within it.

However, swimming through the ocean of your career alone is far too lonely. Because the challenges of project management are unique, finding 'lighthouses on the sea'—mentors who can exchange ideas with you both inside and outside the company and sometimes offer harsh but necessary feedback—is an essential guide to ensure you do not lose your way.


The courage to face difficulties and the harmony of the great voyage called life

Finally, what determines your caliber as a leader is not technique, but the 'courage' to make decisions in difficult situations.
A mindset that takes full responsibility for results, rather than blaming the organization or others for failures, is what generates genuine trust from your team.

Beyond just management, which is doing things right, be conscious of leadership, which is 'doing the right thing' by showing the team a vision of the future. Whether or not you possess this attitude is the boundary between a mere manager and a true captain.

That said, you must not forget the most important truth: 'Your career is not your entire life.'

Family circumstances, health, and age—adjusting the load of your career to match your life stage, and knowing when to step on the gas or ease off, is the most critical management skill for designing a sustainable way of working.
While holding a long-term vision of 'what kind of project I want to be leading in 10 years,' you should also leave room in your heart to enjoy the life right in front of you.

Managing your career is not just about skillfully steering the ship, but also about not neglecting the maintenance of the ship itself—which is you. Calibrating your compass of self-awareness, hoisting the sails of knowledge, and recording your logbook of experience—all of this is so that you can be entrusted with larger, more difficult missions at the next port.

Now, which compass will you polish as you set sail into the next rough sea?



Epilogue

There are moments in the field of management where you break into a cold sweat in the midst of lonely silence.
Even so, PMs look at themselves with cold detachment and write their lessons down in their 'logbooks'.

'A professional delivers results as planned and meets deadlines.'
'A first-class professional proceeds calmly as if nothing is wrong and delivers results.'
'A second-class professional makes a fuss and breaks a sweat along the way, but manages to deliver results in the end.'
'A third-class professional makes a fuss throughout and at the end, leaving problems behind.'
'A fourth-class professional makes a fuss and then disappears without a trace.'

Where do the people you have seen so far, and the person you aim to become, fall on this scale?
Because this is a world that does not follow textbooks, please do not let go of the reins of your own career.