Private strand flush not complete
Symptoms
"Private strand flush not complete" messages are being populated to the alert log for unknown
reasons.
ALERT LOG EXAMPLE:
>>>
Fri May 19 12:47:29 2006
Thread 1 cannot allocate new log, sequence 18358
Private strand flush not complete
Current log# 7 seq# 18357 mem# 0: /u03/oradata/bitst/redo07.log
Thread 1 advanced to log sequence 18358
Current log# 8 seq# 18358 mem# 0: /u03/oradata/bitst/redo08.log
<<<
>>
Cause
The message means that we haven't completed writing all the redo
information to the log when we are trying to switch. It is similar in
nature to a "checkpoint not complete" except that is only involves the
redo being written to the log. The log switch can not occur until all of
the redo has been written.
A "strand" is new terminology for 10g and it deals with latches for redo .
Strands
are a mechanism to allow multiple allocation latches for processes to
write redo more efficiently in the redo buffer and is related to the
log_parallelism parameter present in 9i.
The concept of a strand
is to ensure that the redo generation rate for an instance is optimal
and that when there is some kind of redo contention then the number of
strands is dynamically adjusted to compensate.
The initial
allocation for the number of strands depends on the number of CPU's and
is started with 2 strands with one strand for active redo generation.
For
large scale enterprise systems the amount of redo generation is large
and hence these strands are *made active* as and when the foregrounds
encounter this redo contention (allocated latch related contention) when
this concept of dynamic strands comes into play.
There is always shared strands and a number of private strands .
Oracle 10g has some major changes in the mechanisms for redo (and undo), which seem to be aimed at reducing contention.
Instead of redo being recorded in real time, it can be recorded 'privately' and pumped into the redo log buffer on commit.
Similary the undo can be generated as 'in memory undo' and applied in bulk.
This affect the memory used for redo management and the possibility to flush it in pieces.
The message you get is related to internal Cache Redo File management.
You can disregard these messages as normal messages.
When you switch logs all private strands have to be flushed to the current log before the switch is allowed to proceed.
Solution
These messages are not a cause for concern unless there is a significant gap in seq# between the "cannot allocate new log" message and the "advanced to log sequence" message.
This issue is infact not a bug and is expected behavior.
In some cases, this message can be resolved by increasing db_writer_process value.